A fire strategy is the one part of a building design that every other discipline depends on and almost nobody owns from the start. The architect sets out stairs and compartments, the structural engineer sizes members, the MEP engineers design sprinklers, alarms and smoke control, and the interior designer selects finishes. If no one is holding those decisions together against a single fire and life safety (FLS) strategy, the gaps surface during Civil Defense review, or worse, during an emergency.

Fire and life safety engineering in Saudi Arabia has become more demanding as projects have grown larger and more complex and the regulatory framework has matured. Here is how owners and design teams can approach it with fewer surprises.

The regulatory framework in brief

The Saudi Fire Code, SBC 801, sets requirements for fire protection systems, fire service access, hazardous materials and the safe operation of buildings. It works alongside SBC 201, the general building code, which governs occupancy classification, construction types, compartmentation, interior finishes and means of egress. The 2024 editions of both codes became mandatory on 30 June 2025.

The General Directorate of Civil Defense is the principal authority for fire safety approvals and certificates for most buildings, and many of its services are delivered through its Salamah electronic platform. Facilities under the supervision of the Supreme Authority for Industrial Security (formerly the High Commission for Industrial Security) follow that authority's own safety and fire protection directives.

A point that causes regular confusion: SBC 801 draws on international models, and NFPA standards are frequently referenced for detailed design of systems such as sprinklers, fire alarms and fire pumps. But designing to an NFPA standard does not by itself secure approval in the Kingdom. The Saudi code, its local amendments and the expectations of the reviewing authority come first, and referenced standards apply in the way and to the extent the Saudi code calls for them.

The FLS strategy comes before the equipment

The most valuable FLS document on a project is not a sprinkler layout. It is the fire strategy report: a concise explanation of how the building will protect occupants, support firefighting and limit fire spread. It typically covers occupancy classification and occupant loads, construction type, compartmentation and fire-resistance ratings, means of egress, detection and alarm, suppression, smoke management, fire service access and water supply, and any special hazards.

Prepared at concept stage, it gives every discipline a common basis. Prepared after the design is complete, it tends to become a list of compromises.

Means of egress

Egress design is where architecture and life safety meet most directly. Exit capacity, travel distance, the arrangement of exits, the protection of stairs and the way occupants reach a public way all depend on occupant load, which in turn depends on how each space will actually be used. A floor plan that works for offices may not work if part of it becomes a training room or a prayer hall with a much higher occupant density.

Passive protection

Fire-rated walls, floors and doors, protected shafts, fire-stopping at penetrations and appropriate interior finishes are the quiet backbone of a fire strategy. They are also where on-site errors are most common: an unsealed service penetration or a fire door wedged open can undermine a compartment that looked perfect on the drawings.

Active systems

Detection and alarm, automatic sprinklers, standpipes and hose systems, smoke control and emergency power must be designed as one interconnected system. Their cause-and-effect logic, the sequence of actions that follows an alarm in a given zone, should be documented early and tested before handover.

Façades and high-rise considerations

External walls deserve specific attention. Material selection, cavity barriers and the interface between façade and floor slabs all influence the risk of fire spreading vertically, and they are difficult to correct once cladding is installed. Elevators, refuge provisions and firefighter access become more significant as buildings get taller.

Performance-based design and engineering judgment

Prescriptive code requirements fit most buildings. Some do not: atria, large open-plan spaces, unusual geometries or heritage structures where literal compliance would be impractical. For these, performance-based design and documented engineering judgment offer a route to demonstrate that an alternative solution achieves an equivalent level of safety.

Such approaches need rigorous justification and the formal acceptance of the reviewing authority. Aknan's engineering judgment reports are prepared and stamped by the responsible licensed engineer, and they are valid only once the authority accepts them. That discipline protects owners from relying on solutions that will not survive review.

Existing buildings: the overlooked half of the market

Much of the FLS work in the Kingdom involves buildings that already exist: changes of use, renovations, license renewals, or owners who simply want to know where they stand. Here the starting point is an evaluation of the actual situation rather than the original drawings, which may be outdated or missing.

A structured FLS assessment for an existing building typically involves:

  • A survey of the building as it stands, compared with current life safety requirements.
  • Inspection and testing of existing fire protection systems to confirm they operate as intended.
  • A gap report that sets out deficiencies, ranks them by risk and recommends practical corrective measures.
  • Support with the upgrade design and with obtaining Civil Defense approvals and certificates.

Aknan's fire and safety services cover both new design and existing-building evaluation, which matters because the right upgrade is often a balance between code requirements, building constraints and what can be done while the building stays in use.

Common reasons FLS submissions are delayed

Delays tend to stem from a few recurring issues: occupancy classifications that do not match the intended use, egress calculations that ignore part of the occupant load, inconsistent information between architectural and MEP drawings, missing cause-and-effect matrices, and façade or interior specifications that cannot be shown to meet the required performance. Nearly all of these can be avoided with a clear strategy and a coordinated design review before submission.

Conclusion

Effective fire and life safety engineering in Saudi Arabia starts with a strategy that every discipline designs to, continues with careful coordination and site verification, and ends with systems that are tested and documented. Whether you are designing a new building or bringing an existing one into compliance, early FLS input is one of the most cost-effective decisions you can make.