Every construction project has clashes. A duct runs through a beam, a sprinkler main crosses a cable tray at the same level, a drainage pipe has no room to fall, a door swings into a column. The only question is when they are found. Found in a coordinated model during design, a clash costs a discussion and a revision. Found on site, it costs rework, delays, disputes and often a compromise that the owner lives with for the life of the building.
Building Information Modelling (BIM) and multidisciplinary coordination are the tools that move clash discovery from the site to the design office. Used well, they are one of the most effective ways to protect a project's budget and programme. Used poorly, they produce attractive models that solve very little.
What BIM coordination actually is
BIM is a process of designing and documenting a building using intelligent three-dimensional models rather than separate two-dimensional drawings. Each discipline, typically architecture, structure, mechanical, electrical, plumbing and fire protection, develops its own model. Coordination is the process of combining those models into one federated view, checking where they conflict, and resolving those conflicts through agreed design decisions.
Clash detection software can find geometric conflicts automatically and in great numbers. But software does not resolve anything. The value comes from the coordination process: people from each discipline reviewing the results, deciding who moves what, and updating their models.
Why coordination matters so much in Saudi projects
Several features of the Saudi market make coordination particularly valuable. Cooling loads are high, so ductwork and chilled water pipework are large and occupy a significant share of ceiling voids and shafts. Many projects are delivered on compressed programmes, leaving little room to absorb rework. Mixed-use and high-rise buildings concentrate complex services in tight spaces. And fire protection requirements add another layer of systems that must interface correctly with everything else.
There is also a regulatory dimension. Industry and academic sources report that since early 2024 the Kingdom has required BIM-based architectural submissions as part of building permit applications. Owners should confirm the current requirements for their building category with their engineering office, but the direction of travel is clear: digital design information is becoming part of how projects are approved, not just how they are designed.
How an effective coordination process works
Agree the rules first
Before modelling begins, the project needs a BIM execution plan. It defines what each discipline will model, to what level of detail at each stage, which software and file formats will be used, how models are named and shared, how often coordination takes place, and who is responsible for resolving issues. Without it, models arrive in incompatible forms, at different levels of detail, and coordination becomes an argument about inputs.
Set clash priorities
Not all clashes are equal. A sensible coordination process establishes a hierarchy, usually with structure fixed first, then large ductwork and gravity drainage, then pressurised pipework, then cable containment and smaller services. Clearance zones for access, insulation and maintenance should be modelled, not just the physical elements, because a duct that technically fits but cannot be insulated or maintained is still a problem.
Hold regular coordination meetings
Clash results are reviewed in structured meetings with representatives from each discipline. Issues are assigned, tracked and closed. Thousands of raw clashes often reduce to a much smaller number of genuine design problems once duplicates and minor tolerances are filtered out. What matters is that each genuine problem has an owner and a deadline.
Keep the drawings and the model aligned
Contractors still build largely from drawings. If coordinated decisions are made in the model but not reflected in the drawings, the benefit is lost. Drawings should be produced from, or checked against, the coordinated model.
Carrying the model through construction and handover
Coordination does not stop when design drawings are issued. Contractors and specialist subcontractors develop shop drawings and fabrication details that add information the design model did not contain, such as exact equipment dimensions, hanger positions and connection details. Coordinating these against the design model, and against each other, prevents a second wave of clashes during installation. At handover, a model updated to reflect what was actually built, with key equipment information attached, can become a valuable resource for facility management, provided its scope and level of detail were defined in the BIM execution plan from the start.
Benefits for owners
Effective BIM coordination delivers advantages that owners can see:
- Fewer site clashes, variations and associated claims.
- More accurate quantities for tendering and cost planning.
- Earlier identification of spatial problems, such as insufficient ceiling depth or undersized shafts.
- Clearer visualisation for design decisions and stakeholder approvals.
- Better information for facility management if the model is maintained to as-built status.
It is worth keeping expectations realistic. Coordination significantly reduces conflicts, but no process eliminates every issue. Site tolerances, late design changes and product substitutions can all introduce new problems, which is why coordination should continue into the shop drawing stage and be supported by construction supervision.
Questions owners should ask their consultant
- Will there be a BIM execution plan, and who will maintain it?
- Which disciplines will be modelled, and to what level of detail at each stage?
- How often will coordination meetings take place, and how are issues tracked to closure?
- Will drawings be produced from the coordinated model?
- How will the contractor's shop drawings be coordinated with the design model?
Conclusion
BIM coordination is not a software purchase; it is a discipline of collaboration between architects and engineers, supported by good tools. Projects that plan coordination from the start, enforce clear rules and follow issues through to resolution see fewer surprises on site and better buildings at handover. For owners, asking the right questions about coordination at appointment is one of the easiest ways to reduce construction risk.